6th December 2007.
After having a delay in obtaining timber due to a lack of good quality timber, we ended up with a few interruptions due to rain. Funny considering we are in a drought.

9th December 2007.
Finally some descent building progess... looking through the front door.

Looking through the garage doors from the front of the house. (Notice windows already on site... yippee!)

Standing in the media room looking all the way to the front door. Just thinking that I have to tile all of that

Standing in the media room looking west through the 2 back bedrooms.

Looking from the media room back across the rear lounge room and kitchen towards the walk in pantry.

Standing in the front lounge looking west into the main bedroom and WIR.

Standing in the Dining room looking through the alfresco area towards the media room at the back of the house.

Standing in the front door way looking towards the rear of the house (media room). Yes which ever way I look at that, it still has to be tiled.
